Greenfield Project Master Scheduling for Pulp and Paper Projects

Share

2 Schedules, 1 Integrated Plan: How Timenow Aligned Shutdown and CAPEX Execution in a Pulp and Paper Mill

with Fabio Machado and  Flavio J. Machado

During a major shutdown at a pulp and paper facility, Timenow coordinated QA/QC activities across 269 work orders and audited more than 10 contractors involving over 100 field personnel. The engagement helped avoid 139 hours of unplanned downtime and delivered $6.1 million in cost avoidance.

Timenow’s work included developing plant-specific standards, training internal and third-party teams, and supporting the resolution of nonconformities identified when refurbished parts and equipment were received. The project illustrates how early quality planning and coordinated field execution can protect operational continuity.

Quality assurance (QA) and quality control (QC) are critical to managing outages in heavy industries such as pulp and paper, oil and gas, and other process industries. QA establishes the standards and procedures for quality execution, while QC verifies that completed work meets those requirements. Together, they help operators address issues before production resumes.

Building inspection, testing, and sign-off checkpoints into a master outage schedule can flag readiness and maintenance issues that would otherwise slow or stop operations. Establishing a dedicated QA/QC baseline schedule enhances predictability, especially when paired with contingency planning and forecasting based on inspection findings.

CREATING AN ALIGNED SCHEDULE

Thorough QA/QC planning starts with a master schedule that combines operations, process, and maintenance activities and is approved by the appropriate team leaders before the outage. Early alignment establishes clear checkpoints, responsibilities, and timelines before operations halt and field execution begins.

Every activity on the QA/QC list needs an assigned owner and duration. Timenow’s approach includes real-time schedule updates, cross-referencing, proactive hold-point tracking logs, and daily alignment reports for stakeholders. It also includes start-up readiness dashboards and contingency planning to mitigate risk. Microsoft Project or Primavera P6 can serve as the master scheduling platform, with the schedule tailored to the customer’s maintenance window.

Timenow integrates the outage master schedule with Inspection and Test Plans (ITPs), inspection windows, and QA/QC-defined hold points. Each inspection, test, and sign-off activity is linked to the relevant execution tasks, making dependencies and potential impacts on the critical path visible. This alignment reduces the risk of missed inspection windows and schedule slippage caused by late-stage quality holds.

QA/QC TESTING

During outage execution, daily reports document inspection findings and readiness status, giving plant managers a clearer understanding of asset conditions and potential issues. Effective planning and communication help ensure crews understand inspection requirements and make work available for testing at the right time.

Alignment with vendors, contractors, and technicians is essential. Leadership engagement before the outage helps establish expectations, resolve responsibilities, and support consistent daily reporting.

Daily schedule-quality alignment reviews cross-check field execution progress against QA/QC readiness, flagging conflicts between execution pace and inspection availability before they affect the critical path. Hold-point tracking logs document inspection steps and approvals, supporting traceability, audits, and applicable compliance requirements.

Key benefits of a QA/QC-aligned outage include:

  • Fewer surprises through structured inspections and hold points
  • Clearer start-up readiness through comparison against the approved baseline
  • Real-time visibility through a consolidated view of schedule and quality status
  • Proactive forecasting to anticipate bottlenecks
  • Traceable inspection and approval records
  • Better contractor coordination
  • Less rework as issues are anticipated or corrected early

Integrated schedule-quality alignment helps execution and inspection teams work from a shared view of progress. It also supports lessons learned that can improve planning for future outages.

REDUCING DOWNTIME AND COST

Beyond embedding hold points into the outage master schedule, Timenow provides forecasting and decision-making support throughout execution. Monitoring inspection progress and findings helps teams identify issues before they escalate and assess their implications for the remaining work.

Consolidating schedule and quality information into dashboards gives operators a clearer basis for start-up decisions. Teams can see which activities are complete, which approvals remain outstanding, and where corrective work may affect readiness.

Combining inspection-window forecasting with risk and contingency planning helps operators anticipate bottlenecks and evaluate options to limit outage extensions. When a nonconformity is identified, the team can assess the required response, coordinate resources, and update the schedule to reflect its potential impact.

This approach connects quality findings to operational decisions, helping leaders understand what needs to happen before equipment can return to service.

FROM QUALITY PLANNING TO MEASURABLE RESULTS

The pulp and paper shutdown demonstrates the value of integrating quality oversight with maintenance and contractor coordination. Timenow combined early QA/QC involvement, structured inspection tools, and real-time tracking to support field execution and resolve quality issues.

With approximately 20:1 ROI reported for the engagement, the results reinforce the business value of treating QA/QC as part of outage planning and execution. For operators, the lesson is clear: inspection requirements, responsibilities, and corrective actions need to be coordinated with the schedule from the outset.

Read the full case study.

INTEGRATED SUPPORT FROM PLANNING THROUGH START-UP

Timenow develops detailed outage schedules that connect inspection requirements, field execution, and start-up readiness. Its specialists help establish responsibilities before the outage, monitor quality checkpoints throughout execution, and translate inspection findings into actionable schedule updates.

By aligning schedule, inspections, and quality from planning through closeout, Timenow helps clients reduce surprises, improve coordination, and minimize the operational impact of nonconformities.